Logo
  • Email

    info@tgsi.us
  • Phone

    +966 11 230 1755
  • Location

    Al Mousa Center, Tower 2, 6th floor, Office 261 :6613 Olaya Street, Riyadh 2616-12221, Kingdom of Saudi Arabia

ev quic

As we move towards sustainability, electric vehicles have emerged as the key player in shaping the future of transportation. 

Charging network expansion is crucial for EV adoption, involving increased stations, broader locations, and enhanced capacities. A robust charging network alleviates range anxiety, which is vital for widespread EV use.

EV Quic delivers a complete suite of EV solutions, including chargers, solar energy systems, and batteries, promoting sustainability across various sectors.

Products, Solutions & Services

Offers three (3) different EV infrastructure solutions tailored to fulfill all segments and your needs.

DC Chargers

Ultrafast with high power outputs and much faster charging speed, starting from 40kW to 360kW for the fleet industry, destinations, and on-routes.

AC Chargers

Best suited to homes, workplace, or public locations and will charge at speeds 3.7kWh to 22kWh.

Products, Solutions & Services

From streets to residences, from fleets to retails, we are the brand of choice for the world's electric vehicle network operators.

Carrying overall electrified charging solutions for the transport of our future, today.

Public & Commercial EV Charging

AC Destination

3-22 KW
4-16 hours

DC Destination

20-25 KW
1-3 hours

DC Fast

50-150 KW
20-90 min

DC High Power

150-350 KW+
10-20 Hours

EV Infrastructure Process

01

Choose the Right Location

Site survey to check size of EV cars, population, easy access

02

Detection and inspection

Detect and inspect any existing infrastructure

03

Excavation Work

Prepare the designated area for the foundation

04

Foundation Execution

Decide between a precast or a traditional foundation

05

Cable Layout

Lay out the cables based on the pre-determined design

06

Termination
Phase 1

Connect the cable from the main power source to the ESS MDP hub.

07

Termination
Phase 2

Terminate the cable from the side of the EV charging machine itself.

08

Finishing Work

Installing pavers, curbstones, tiles, and painting parking spots.

09

Install Shading Elements

Depending on the client’s preference

*Implement all necessary warning and safety measures throughout the process

Work with us

We would love to hear more about your project

Contact Us

Al Mousa Center, Tower 2, 6th floor, Office 261 :
6613 Olaya Street, Riyadh 2616-12221, Kingdom of Saudi Arabia

© 2024 | Alrights reserved by TGSI

Have a project in your mind?

© 2024 | Alrights reserved by TGSI

Email

Have a project in your mind?